OEL/RFP/001/2015-2016 : Road Survey and Structural Designs for the Proposed Elelea – Kokoit – Barrier Road
Opening Date: 16-11-2015 Closing Date: 15-01-2016 Status: Cancelled
Summary

The objectives of this assignment are:

  1. To conduct a road survey and prepare the structural designs of a new all-weather road linking Kokoit to the Barrier that is expected to be about 40km long.
  2. To identify ways of repairing the degraded sections of the existing Lokichar – Lokori – Elelea – Kokoit road.
  3. To supervise construction companies executing the upgrading/construction of the same access roads.
Details
OEL/RFP/002/2015-2016 : Environmental Baseline and Roads Construction ESIA
Opening Date: 16-11-2015 Closing Date: 15-01-2016 Status: Cancelled
Summary

The objectives of this assignment are:

  1. To undertake initial environmental audit reports for Olsuswa Energy’s proposed Katilia – Barrier road upgrade.
  2. To assess the impacts of the proposed developments which include: new roads, bridges and drifts.
  3. To prepare baseline environmental audit reports for Olsuswa Energy’s planned surface studies at the Barrier Volcanic Complex.
  4. To assess the impacts of the surface studies to be carried out at Barrier Volcanic Complex.
Details
OEL/RFP/003/2015-2016 : Detailed Geoscientific Surface Study
Opening Date: 16-11-2015 Closing Date: 15-01-2016 Status: Closed
Summary

The objective of this assignment is:

  1. To carry out geophysical surveys, geochemical surveys, geological mapping, gravity analysis and micro-seismic surveys as well as generate a detailed structural map, a gravity anomaly map and a micro-seismic events map and ultimately a conceptual model for the geothermal concession area located within the Barrier Volcanic Complex.
Details
OEL/RFP/004/2015-2016 : Provision of Consulting Services for Geothermal Exploration Activities
Opening Date: 16-11-2015 Closing Date: 15-01-2016 Status: Closed
Summary

The role of the consultant shall be to provide the following services:

  1. Project management and advisory– Reviewing the Barrier geothermal exploration and execution plans.
  2. Capacity building – Training of Olsuswa Energy’s key personnel.
  3. Geoscientific data quality control and assurance coupled with geoscientific data interpretation.
  4. Technical reporting and presentation.
  5. Baseline and ESIA reports review.
  6. Recommendation of relevant geothermal project management software for data storage, processing and interpretation.
Details